+7 905-234-07-07

Продажа и обслуживание кондиционеров. Санкт-Петербург.

Collage1 Collage2 Collage1

English language

Installation of air conditioners.

Long-term, regular and economical operation of the equipment depends on the quality of installation. We describe how to make installation of the example of «direct» mounting.

Originally selected mounting position, away from heat sources and places that could affect the difficulty of airflow. After selecting the place is marked (by level) and secured with mounting plate (attached specialized materials that are appropriate for its type and characteristics of manufacturing floor). Then choose a place for through-hole diameter, which is 40mm. This hole serves to connect the internal and external communications unit, as well as for removal of condensate from the indoor unit. Communications are insulated and fill all the holes. Then set the indoor unit, after which the tuberollingand connected to the unit. Next, connect the power and interconnect the power cord is pulled the air conditioner to the power source (outlet or a shield to the machine). After the complete installation of the indoor unit turn comes to outdoor. First, fixed brackets (they attach specialized fasteners), which is installed and secured outdoor unit, and then attach it to the communication, and seal the bore. After connecting the communication forms a closed loop, through which the refrigerant. Refrigerant itself is closed to the outdoor unit, and before its release into the system it must beevacuate. This is done using a vacuum pump which is connected to the outdoor unit.Vacuumshould be not less than 15 minutes to remove moisture and air from the system. After vacuuming allowed refrigerant to the system. Then supply power to the air conditioner and check the performance of the system as a whole. To install the outdoor unit at a height greater than 4 — 4.5 feet use the services of high-altitude climbers, whose work is pre-negotiated with the customer.

This montazh is different from other montages that communication is limited in length (no more than 3metrov), and refrigerant, which is limited to factory-dressing of the air conditioner unit. In the case of a more complex assembly (length of the tracks for more than 3 meters) may be required (depending on model and length of the final communications conditioner) refilling refrigerant.

With all the prices for additional work, materials and services can be found in the table below:

TYPE AIR CONDITIONER

PERFORMANCE

The cost of installation

Split systems (WALL)

up to 3 kW

256 USD.
75,3USD. (Climber)
+ 19,3USD. for each additional meter of road
+ 8,13USD. for the 1-meter cable channel.

from 3 kW to 4.5 kW

286,14 USD.
81,33 USD. (Climber)
+ 21,68 USD. for an additional meter of road
+ 9,04 USD. for the 1-meter cable channel.

4.6 kW - 5.3 kW

316,27 USD.
87,35 USD. (Climber)
+ 21,69 USD. for an additional meter of road
+ 9,04 USD. for the 1-meter cable channel.

from 5.4 kW to 7.3 kW

331,33 USD.
93,4 USD. (Climber)
+ 24,1 USD. for an additional meter of road
+ 12,05 USD. for the 1-meter cable channel.

from 7.4 kW to 9.0 kW

346,4 USD.
99,4 USD. (Climber)
+ 24,1 USD. for an additional meter of road
+ 12,05 USD. for the 1-meter cable channel.

More than 9.0 kW

361,5 USD.
105,5 USD. (Climber)
+ 28,6 USD. for each additional meter of road
+ 12,05 USD. for each additional meter of cable channels.

The works included in the cost of installation:

Additional Services:

When installing an expensive complexdiscount, the discount decides

Manager in the preparation of the arrangement.